Here is a list of the
detailed steps we perform to ensure that
your new system is operating at peak
efficiency and putting you in the TOP 10%
 |
Furnace Air/Handler set - blowers
speed set for proper cfm |
 |
Filter
rack installed |
 |
Evaporator coil installed and
leveled |
 |
Emergency drain pan and safety
switch installed and tested |
 |
Gas
piping completed and leak tested |
 |
Furnace venting complete with proper
supports, clearance and rise |
 |
Combustion air intake completed |
 |
All
pilot lights lit (furnaces and water
heaters check out) |
 |
Condenser set with vibration pads in
place |
 |
Condenser level |
 |
Refrigerant piping completed and
leak tested |
 |
Condensate drain installed and
tested |
 |
Condensate pump installed, safety
switch wired and tested |
 |
Thermostat installed level, heat
anticipator set, and checked out |
 |
Air
cleaner installed |
 |
Electronic air cleaner operation
(include air flow switch) checked |
 |
Ducting complete |
 |
Supply
air dampers installed |
 |
Registers installed and level |
 |
Insulation complete |
 |
Low
voltage complete |
 |
Line
voltage completed |
 |
Furnace started up and checked out
(dip switches set - variable speed) |
 |
Air
conditioner or heat pump started up
and checked for proper refrigerant
charge |
 |
Electric heat started up and checked
out |
 |
All
work areas clean and trash removed |
 |
Homeowner given all homeowner's
manuals |
 |
Homeowner instructed on how to
operate humidstat, thermostat and
clean or change filters |